Oil Extraction Plant

Al Dabb'iya (UAE)

Oil Extraction Plant, Al Dabb'iya - UAE

Generating Set of 500 kVA equipped with:

- IP55 Container 40', 85 dB(A) 1 m, equipped with:
- Automatic Control Board with reverse synchronization
- 380 V three phase and 50 Hz frequency
- Alternator with sleeves bearings
- 5000 L external fuel tank

Back to the list